PENENTUAN WAKTU BAKU DENGAN METODE STOPWATCH TIME STUDY PROSES PRODUKSI MANIFOLD (UD. JAYA MOTOR PASURUAN)
Main Article Content
The increasing growth in the industrialized world today, companies are expected to compete and compete healthily is good in terms of quality, price, and service information to customers against the length of time a product is made. UD. Jaya is a Motor home industry engaged in the two-wheeled automotive spare parts, one innovation UD. Jaya Motor which are many devotees are manifold, the product is used for a special channel on go to drain the air from the carburetor into the engine. Problems occurred was delivery delays to the consumer due to the length of time the production is not yet in the know clearly, where the calculations only using estimates against defects. After doing the calculation the Stopwatch Time Study was obtained by that standard time process of making Manifold is 2460 seconds
/41 minutes per product.
Chandra Seteven. 2013. Perancangan Standart Prosedur Kerja Dalam Proses Perakitan Speke Tower Di PT. Hartono Istana Teknologi, Kudus. Skripsi Universitas Atma Jaya Yogyakarta.
Febriana, Lestari, Anggraini. 2013. Analisa Pengukuran Waktu Kerja Dengan Metode Pengukuran Kerja Secara Tidak Langsung Pada Bagian Pengemasan di PT. Japfa Comfeed Indonesia TBK. Vol4 No 1. Jurnal Industri. 2013. 66-73.
Khadijah, Intan dan Kusumawardhani, Amie. 2016. Analisa Pengukuran Kerja Untuk Mengoptimalkan Produktivitas Menggunakan Metode Time and Montion Study. Volume 5, Nomer 3, Diponogor Jurnal Of Management. 2016. 1-15.
Maryana dan Meutia, Sri. 2015. Perbaikan Metode Kerja Pada Bagian Poduksi Dengan Menggunakan
Man and Machine Chart. Jurna Teknovasi. Volume 02, Nomor 2. 15-26.
Permata, Sari Hartantri Lusia. 2016. Work Meansurement Approach to Determine Standard Time in Assembly Line. Volume-2, Issue-10, Edisi-1.
Penyusun, Tim Dosen Teknik, 2017. Buku Pedoman Penyusunan Seminar Proposal Dan Skripsi.
Purwosai:Yudharta Advertising.
Rachman, Taufiqur. 2013. Pengunaan Metode Worksampling Untuk Menghitung Waktu Baku dan Kapasitas Produksi Karung Soap Chip di PT. Sa. Jurnal Inovisi™. Vol. 9, No.1, 2013. 48-60.
Saputra, Punandes, D.2014. Penetapan Standart Waktu Proses Produksi Pakaian Seragam Sekolah Menengah Atas (Studi Kasus Adiguna Tailor dan Elwis Tailor Sebagai Objek Pembanding) Skripsi Universitas Bengkulu.
Suprianto Nanang M. 2016. Penentuan Waktu Baku Proses Produksi KasurUntuk Meningkatkan Produktivitas Perusahaan (Studi Kasus Pada CV. Mulyono Jaya Pandaan). Skripsi Universitas Yudhartha Pasuruan.
Widiawati, Tri U. 2009. Deskripsi Time and Montion Study Untuk Mengetahui Waktu Baku di Produksi Sambal PT. Heinz ABC Indonesia Karawang : Laporan Khusus. https://eprints.uns.ac.id/4840/1/101971409200909321.pdf dikunjungi tanggal 28 Mei 2018