[1]
Andi and Hermansyah 2018. PENERAPAN TPM DENGAN MENGGUNAKAN OVERALL EQUIPMENT EFECTIVENESS (OEE) DAN SIX BIG LOSSES PADA MESIN REVERSE OSMOSIS DI BAGIAN UTILITY PT. WIDATRA BHAKTI. JKIE (Journal Knowledge Industrial Engineering). 5, 2 (Aug. 2018), 73-80. DOI:https://doi.org/10.35891/jkie.v5i2.2017.