ANALISA PERAWATAN MESIN PROTOS 1-8 MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) DI PT. XYZ. Journal Mechanical and Manufacture Technology (JMMT), [S. l.], v. 5, n. 2, p. 48–60, 2024. DOI: 10.35891/jmmt.v5i2.5664. Disponível em: https://jurnal.yudharta.ac.id/v2/index.php/jmmt/article/view/5664. Acesso em: 11 jun. 2026.