“ANALISA PERAWATAN MESIN PROTOS 1-8 MENGGUNAKAN METODE RELIABILITY CENTERED MAINTENANCE II (RCM II) DI PT. XYZ” (2024) Journal Mechanical and Manufacture Technology (JMMT), 5(2), pp. 48–60. doi:10.35891/jmmt.v5i2.5664.