Project Management Analysis of Manufacturing Laboratory Development by Considering Risk Factors
Main Article Content
Laboratory construction project is a project owned by the University of XYZ Madiun. Laboratory construction has the goal of adding practice facilities to the industrial engineering department. Laboratory construction supports the offline learning process when students do practice activities. This project was carried out by PT ABC with a project value of Rp. 500.000.000. PT ABC was selected through an appointment stage by the project owner without a tender process. Laboratory construction process was built for 12 weeks. Laboratory construction process was built from early June 2021 until the end of August 2021. Manufacturing laboratory projects require a review of project management and risk management in their implementation so that project work can avoid delays in time. Project management analysis shows that the critical track is the activity of A-C-F-G with a total duration of 84 days and the probability of the project being completed is 96.16%. The calculation of the average profit obtained by project implementers is Rp 59.893.125. Risk management measurements show that high category risks are erratic weather, poor safety regulations in the field, and low levels of management discipline.
Arianie, G. P., & Puspitasari, N. B. (2017). Perencanaan Manajemen Proyek dalam Meningkatkan Efisiensi dan Efektifitas Sumber Daya Perusahaan (Studi Kasus : Qiscus Pte Ltd). J@ti Undip : Jurnal Teknik Industri, 12(3), 189.
Armaeni, N. (2014). Kajian Etika dan Profesionalisme dalam Bisnis Konstruksi Indonesia. Paduraksa, 3(2), 45–60.
AS/NZS. (2004). Risk Management : AS/NZS 4360:2004. Standards Australia/Standards New Zealand.
Asnuddin, S., Tjakra, J., & Sibi, M. (2018). Penerapan Manajemen Konstruksi Pada Tahap Controlling Proyek (Studi Kasus : Bangunan Laboratorium Fakultas Teknik Universitas Sam Ratulangi Manado). Jurnal Sipil Statik, 6(11), 895–906.
Azizah, S. U., Yamali, F. R., & Handayani, E. (2020). Analisa Nilai Hasil Terhadap Waktu pada Proyek Pembangunan Gedung Laboratorium FKIP Tahap IV (Lanjutan) Universitas Jambi. Jurnal Talenta Sipil, 3(2), 95.
Bayu Dharma, A. A., Adnyana Putera, I. G. A., & Parami Dewi, A. A. D. (2017). Manajemen Risiko Keselamatan Dan Kesehatan Kerja (K3) Pada Proyek Pembangunan Jambuluwuk Hotel & Resort Petitenget. Jurnal Spektran, 5(1), 47–55.
Coşkun, S., Kayıkcı, Y., & Gençay, E. (2019). Adapting Engineering Education to Industry 4.0 Vision. Technologies, 7(1), 10.
Fahlevi, A. E., Ismail, A., & Susetyaningsih, A. (2019). Analisis Manajemen Risiko Pelaksanaan Proyek Konstruksi. Jurnal Konstruksi, 17(1), 28–36.
Gray, C. F., & Larson, E. W. (2007). Manajemen Proyek, Edisi 3. Andi.
Hadi, S., & Anwar, S. (2018). Proyek Analisis Manajemen Pelaksanaan Proyek Pembangunan Laboratorium Fakultas Ekonomi UNSOED. Jurnal Konstruksi, 7(2), 111–117.
Ismiyati, I., Sanggawuri, R., & Handajani, M. (2020). Penerapan Manajemen Resiko pada Pembangunan Proyek Perpanjangan Dermaga log (Studi Kasus: Pelabuhan DalamTanjung Emas Semarang). Media Komunikasi Teknik Sipil, 25(2), 209.
Iswati, Hartono, W., & Sugiyarto. (2017). Analisis Value Engineering dengan Metode Zero-One pada Proyek Pembangunan Gedung Laboratorium Komputer Kampus 3 Universitas Ahmad Dahlan Yogyakarta. Matriks Teknik Sipil, 5(1), 83–89.
Kirana, A. (1996). Etika Bisnis Konstruksi. Kanisius.
Kusuma, Y. A., Tama, I. P., & Sari, R. A. (2015). Analisis Manajemen Risiko Pada Proyek Kereta OKA 140303 dan 140304. Jurnal Rekayasa Dan Manajemen Sistem Industri, 3(4), 787–798.
Larasati, D. A., & Sutopo, W. (2020). Analisis Efektivitas Jadwal Proyek Implementasi Software dengan Critical Path Method: Studi Kasus. Jurnal INTECH, 6(1), 55–64.
Maulidi, A., Arifin, S., & Suyoso, H. (2021). Penjadwalan Proyek Konstruksi Menggunakan Critical Path Method (Studi Kasus : Gedung Laboratorium Terpadu Fakultas Teknik Universitas Jember). Jurnal “MITSU” Media Informasi Teknik Sipil UNIJA, 9(1), 1–8.
Messah, Y. unit., Widodo, T., & Adoe, M. (2013). Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi Gedung di Kota Kupang. Universitas Nusa Cendana, 2(2), 157–168.
Nandana, W. A. R., & de Mel, W. R. (2016). Integrated Laboratory Experiment Setup to Empower The Engineering Education in Distance Mode. Asian Association of Open Universities Journal, 11(1), 13–23.
Nugroho, D. F., Yakin, K., & Bustamin, M. O. (2018). Kajian Risiko Kecelakaan Kerja Terhadap Manajemen Kesehatan Dan Keselamatan Kerja (K3) (Proyek Pembangunan Villa Grand Sinensis PT.Wahana Karya Wijaya). Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 1(2), 95–101.
Peraturan Menteri Pendidikan dan Kebudayaan Republik Indonesia No. 3 Tentang Standar Nasional Pendidikan Tinggi, (2020).
Permatasari, D. Y., Bakar, A., & Saleh, A. (2015). Usulan Pengendalian Proyek Pembangunan Gedung Kantor Education Center Samarinda–Kalimantan Timur (Studi Kasus di PT Nusantara Citra). Reka Integra, 3(1), 200–211.
Pesa, F. A., & Taufik, H. (2017). Tinjauan Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) (Studi Kasus: Pembangunan Gedung Living World Pekanbaru). Jurnal Online Mahasiswa (JOM) Bidang Teknik Dan Sains, 4(1), 1–11.
PMI. (2021). A Guide to the Project Management Body of Knowledge (PMBOK Guide). Project Management Institute.
Salimah, A., M., D. R., & T., A. T. (2019). Analisis Manajemen Risiko Pada Proyek Pembangunan Jembatan. Construction and Material Journal, 1(2), 191–200.
Santosa, B. (2009). Manajemen Proyek : Konsep dan Implementasi. Graha Ilmu.
Soeharto, I. (2002). Studi Kelayaan Proyek Industri. Erlangga.
Sulthoni, M. A. (2021). Strategi Penyelenggaraan Praktikum dan Pengelolaan Laboratorium Pendidikan di Program Studi Sarjana Teknik Elektro. Journal Administrasi Pendidikan, 8(1), 102–113.
Tama, A. K., Anggraini, L., & Tutuko, B. (2020). Analisis Kinerja Manajemen Konstruksi Pada Proyek Gedung Digitasi Universitas Negeri Semarang. TEKNIKA, 1(1), 1–15.
Wisudawati, N., & Patradhiani, R. (2020). Analisis Risiko Keselamatan dan Kesehatan Kerja (K3) dengan Metode Hazard Analysis (Studi Kasus pada Proyek Pembangunan Perumahan). Integrasi : Jurnal Ilmiah Teknik Industri, 5(1), 29.
Wospoga, R., Rafi’e, & Wardhani, N. (2015). Analisa Pembiayaan Proyek Pembangunan Lanjutan Gedung Laboratorium Terpadu FKIP Universitas Tanjungpura Pontianak. JeLAST : Jurnal PWK, Laut, Sipil, Tambang, 2(2), 1–7.
Yuliani, U. (2017). Manajemen Risiko Keselamatan dan Kesehatan Kerja (K3) Pada Infrastruktur Gedung Bertingkat. Jurnal Desain Konstruksi, 16(1), 92–100.
Yulianto, A. (2013). Optimasi Penjadwalan Proyek Menggunakan CPM Dengan Algoritma Genetika Pada Studi Kasus Proyek Pembangunan Laboratorium Ekonomi Ubhara Surabaya. Extrapolasi Jurnal Teknik Sipil Untag Surabaya, 06(02), 45–56.