Determination of Maintenance Time Interval Scheduling on Jaw Crusher Machine with Reliability Centered Maintenance Method At PT. X In Rembang

Authors

  • Moh Muhyidin Agus Wibowo Program Studi Teknik Industri, Universitas PGRI Ronggolawe Tuban, Indonesia
  • Anggia Kalista Program Studi Teknik Industri, Universitas PGRI Ronggolawe Tuban, Indonesia
  • Hendra Suwardana Program Studi Teknik Industri, Universitas PGRI Ronggolawe Tuban, Indonesia
  • Muhammad Hendriyanto Parayuda Program Studi Teknik Industri, Universitas PGRI Ronggolawe Tuban, Indonesia

DOI:

https://doi.org/10.35891/jkie.v13i1.3228

Keywords:

Jaw Crusher, Maintenance, Reliability Centered Maintenance

Abstract

The manufacturing industry in the construction-support mining sector faces significant challenges in maintaining the reliability of production equipment, particularly in jaw crusher machines used for andesite stone processing. Frequent machine breakdowns during production activities can reduce productivity, increase downtime, and cause financial losses. This study aims to identify critical components and determine optimal maintenance intervals using the Reliability Centered Maintenance (RCM) method. The analysis results indicate that the critical components of the jaw crusher machine are the Bearing, Toggle, Electric Motor, and Spring. The Bearing and Toggle components require corrective maintenance strategies with maintenance intervals of 111 days, while the Electric Motor and Spring components require preventive maintenance strategies with intervals of 119 days and 109 days, respectively. The proposed maintenance scheduling can be used as a basis for improving machine reliability, minimizing downtime, and enhancing maintenance effectiveness in the production process.

Downloads

Download data is not yet available.

References

Elgendi, E. O., & Shawki, K. (2021). Automated process control system of Jaw crusher production. Journal of Physics: Conference Series, 2128(1), 12034.

Firdaus, N., Ab-Samat, H., & Prasetyo, B. T. (2023). Maintenance strategies and energy efficiency: a review. Journal of Quality in Maintenance Engineering, 29(3), 640–665.

Fuzhen, Y. (2024). Jaw Crusher. In The ECPH Encyclopedia of Mining and Metallurgy (pp. 982–985). Springer.

Geisbush, J., & Ariaratnam, S. T. (2023). Reliability centered maintenance (RCM): literature review of current industry state of practice. Journal of Quality in Maintenance Engineering, 29(2), 313–337.

Maistry, K., Hurreeram, D. K., & Ramessur, V. (2017). Total Quality Management and Innovation. International Journal of Quality & Reliability Management. https://doi.org/10.1108/ijqrm-04-2015-0061

Patil, S. S., & Bewoor, A. K. (2022). Optimization of maintenance strategies for steam boiler system using reliability-centered maintenance (RCM) model–A case study from Indian textile industries. International Journal of Quality & Reliability Management, 39(7), 1745–1765.

Ramadhani, F. I. (2023). Perancangan Implementasi Total Productive Maintenance pada Mesin Dyeing menggunakan Metode Overall Equipment Effectiveness (OEE), Failure Mode and Effect Analysis (FMEA), dan Plan-Do-Check-Action (PDCA). Universitas Islam Indonesia.

Rosyidi, K., Kurniawan, Y., Ghofar, M., Fathurrohman, A., & Hamidah, N. (2023). Downtime Rejection Monitoring dengan Metode Problem Solving Group pada Mesin Checkmat PT. Tirta Investama Plant Pandaan. Journal of Industrial System Engineering, 2(1), 63–72.

Rosyidi, K., Sucipto, S., Santoso, I., & Wibisono, Y. (2025). Priority risk mapping for halal meat production using FMEA method in medium-scale chicken slaughterhouse. Advances in Food Science, Sustainable Agriculture and Agroindustrial Engineering (AFSSAAE), 8(3).

Windyarti, P., & Rosyidi, K. (2025). Risk Criticality Analysis pada Produksi Daging Ayam dengan Metode FMECA di RPA Satria Jaya Pasuruan. Blend Sains Jurnal Teknik, 4(1), 163–174.

Published

2026-05-13

Issue

Section

Articles

How to Cite

Determination of Maintenance Time Interval Scheduling on Jaw Crusher Machine with Reliability Centered Maintenance Method At PT. X In Rembang. (2026). JKIE (Journal Knowledge Industrial Engineering), 13(1), 20-31. https://doi.org/10.35891/jkie.v13i1.3228

Most read articles by the same author(s)